Another issue: some freights have unrealistic time schedules, currently i have a freight from Al-Fashir to Ngoura, due to road conditions and wilderness the needed time is at least 3 times higher (needed breaks and slow speed to not damage truck trailer and freight completely) the time schedule perhaps doable on the A7 on Sundays but not on rough pists. It was a freight from the company that does not show even if freight is picked, perhaps some finetuning needed.
In Massaguet (East entry) Filling capability and repair capability just on empty field, at least a barrack and a tanktruck should be there, same on western side.
RTA Massaguet east entrance assets for filling station and repair shop missing ;[11/09/2023 16:30:21] (sec+0005+0056);21034.2;7.24738;227071;-1.75971;-0.116156
Ndjamena coming from the east over the bridge, there is surface at the end of the bridge missing (you can look below the surface)
RTA NDjameina Terrain missing ;[11/09/2023 16:23:28] (sec+0004+0057);17198.6;9.87327;230435;-2.41107;-0.207276
Gamborou Tireshop and fillingstation do not show up (perhaps the missing 0,17%), same as in the old version
RTA Gamboru Fillingstation and Workshop do not discover ;[11/09/2023 13:53:42] (sec+0002+0057);10390;7.34107;230448;1.93402;-0.121613
Fotokol flying building north of the street
RTA Flying house in Fotokol ;[11/09/2023 16:04:41] (sec+0002+0057);10871.4;6.38378;230235;1.32987;-0.135047
When leaving cameroon the transparent shows on both sides "Welcome to Cameroon", shouldn't welcome not only be visible when entering?
RTA Border exit Cameroon greets Welcome to Cameroon ;[11/09/2023 16:43:37] (sec+0004+0058);16105.9;14.6629;232718;-1.60996;-0.138161
N`Djameina two little road pieces not explorable
first opposite to the company next to the truck dealer,
RTA NDjameina Roadpiece not discoverable First Issue ;[11/09/2023 16:11:22] (sec+0004+0057);16558.7;5.53959;230680;2.10995;-0.14016
Second opposite of the truck dealer
RTA NDjameina Roadpiece not discoverable Second Issue ;[11/09/2023 16:13:01] (sec+0004+0057);16540.2;5.3932;230589;-0.919238;-0.166913,
both roads are closed and so are not explorable (same as in the old version).
Massaguet Filling station on the west side does not show up (tiny grey bar remains)
RTA Massaguet West entrance Filling station Tanker or barrels or barrack missing ;[11/09/2023 16:26:46] (sec+0005+0056);20593.9;6.36931;227379;0.428372;-0.121936
At the entrance to the company at the west side there is surface missing
RTA Massaguet company entrance missing terrain, if looked from the company side ;[11/09/2023 16:28:40] (sec+0005+0056);20673.3;7.5902;227301;-2.4912;-0.553889
From Massaguet going northbound suddenly the Framerate is divided by 2 (too many too detailed trees?)
RTA Road Massaguet to Massakory Framedrop begins 100 to 45 ;[11/09/2023 16:49:49] (sec+0005+0056);20809.1;5.281;226657;-0.0191597;-0.509083
RTA Massaguet to Massakory Frames begin to normalize ;[11/09/2023 16:52:51] (sec+0005+0056);20906.4;5.29002;225769;-0.197263;-0.508757
Freight from Massaguet to Faya-Largeaux (Electronics) unrealistic time schedule 24h instead of 40h + 3*8h rest = total app. 64 h.
Another freight from Ndjameina to Faya-Largeaux (plastic waste) same issue, it seems the dring time between massakory and Faya-Largeaux is asummed with light of speed due to no speedlimit, but roadconditions often only allow pedestrian speed, otherwise truck, trailer and freightdamage.
Massakory Big piece of road not discoverable (next to the market) same as in old version
RTA Massakory Big chunk of Road not explorable ;[11/09/2023 16:37:52] (sec+0005+0055);22392.4;9.39575;221217;-2.22104;-0.15071